API RP 14F PDF

Find the most up-to-date version of API RP 14F at Engineering The American Petroleum Institute’s Recommended Practice for Design and Installation of Electrical Systems for Offshore Petroleum Facilities, API RP 14F, un . Nov 5, For facilities classified as Zone 0, Zone 1, or Zone 2, reference API 14FZ, Recommended Practice for Design and Installation of Electrical.

Author: Juhn Dagis
Country: Uganda
Language: English (Spanish)
Genre: Education
Published (Last): 20 December 2009
Pages: 491
PDF File Size: 8.11 Mb
ePub File Size: 4.58 Mb
ISBN: 706-4-94467-267-1
Downloads: 84271
Price: Free* [*Free Regsitration Required]
Uploader: Shakami

About project SlidePlayer Terms of Service. This document recommends minimum requirements and guidelines for the design and installation of new piping systems on production platforms located offshore. Markings on pr equipment to ensure the correct location of installation are as follows; Zone Equipment.

If you wish to download it, please recommend it to your friends in any social system.

The basic function of a FPS is to receive hydrocarbons from the wellhead, process the hydrocarbons, and store Energy Limited nL Limit energy of sparks; wpi 14c temperature of a device replaced by Ex ic. This recommended practice is intended to assist in development of a management program designed to promote safety and environmental protection during the performance of offshore oil and gas and sulphur operations.

API RP 14FZ PDF

C — Sparking equipment in which the contacts aapi suitably protected other than by restricted breathing. If Associate Apparatus is placed in the classified area then it must have another ai of protection. Associated Apparatus Is apparatus that not all the circuits are intrinsically safe.

Mineral-insulated metal-sheathed cable as defined by NEC Article Applicable gas classification group s. This recommended practice covers methods of installation for pressure-relief devices for equipment that has a maximum allowable working pressure MAWP of 15 psig 1.

30 CFR 250.114 – How must I install, maintain, and operate electrical equipment?

Sealing accomplished by fusion of metal to metal or sealed through glass to metal. This is to provide a higher level of protection for their hazardous area equipment and personnel as they deem necessary. Medias this blog was made to help people to easily download or read PDF files.

  ISO 29167 PDF

This document provides guidelines and recommended practice for the satisfactory design of offshore structures against fire and blast loading.

Must provide adequately maintained breathers and drains apj prevent accumulation of moisture This document provides guidelines and recommended practice for the satisfactory design of offshore structures against fire and blast loading.

The surrounding gas air mixture aip automatically pai with out a spark being formed. Thus, the protection techniques for equipment to be installed in Zone 1 locations can be less demanding than the protection techniques for equipment to be installed in Division 1 locations. Why is it NOT acceptable? The classified areas are different and some protection concepts also differ. Metal-clad cable as defined by NEC Article This document recommends minimum requirements and guidelines for the design apu installation of electrical systems apk fixed and floating petroleum facilities located offshore.

RP 14F, Electrical Systems for Offshore Petroleum Facilities, 6th ed.

Metal-clad cable for hazardous locations as defined in UL MI cable: Disconnect switches in general purpose enclosures should not be used offshore in classified locations; this is a departure from the NEC. Grounding of electrical equipment on fixed and floating offshore petroleum facilities in a positive manner is of particular importance because personnel standing on steel decks or in contact with steel framing present a low impedance path to ground, effectively grounded For sizing equipment grounding conductors, refer to NEC Table.

This ensures that apu gas or vapor located above the arcing or sparking parts or the gas or vapor located exterior apu the enclosure cannot be ignited by the electrical arcing parts within the oil.

Strict rules must be followed, system calculated to ensure energy levels are within tolerances and diagrams must be followed closely as wells as the current RP, Codes and Standards. This document recommends minimum requirements and guidelines for the design, installation, and maintenance of electrical systems on fixed and floating petroleum facilities located offshore.

  CURS REFLEXOTERAPIE PDF

This document recommends minimum requirements and guidelines for the design and installation of new piping systems on production platforms located offshore. This Recommended Practice is intended to serve as a guide to crane owners and operators in developing operating and maintenance practices and procedures for use in the safe operation of pedestal-mounted revolving cranes on fixed or oating offshore platforms, jacku Regulators such as U.

This document recommends minimum requirements and guidelines for the design and installation of electrical systems on fixed and floating petroleum facilities located offshore.

This recommended practice covers methods of installation for pressure-relief devices for equipment that has a maximum allowable working pressure MAWP of 15 psig 1. This equipment has additional security against the possibility of excessive temperature and the equipment is assembled very carefully to ensure that arcing or sparking from part to part or connection to connection will not occur.

Explosion proof equipment may not provide protection against the ingress of liquids or solids therefore, breathers and drains may be required. Must be installed in and explosion proof container unless the certificate states otherwise.

They accomplish this by maintaining a permanent seal. This document recommends minimum requirements and guidelines for the design and installation of electrical systems on fixed and floating petroleum facilities located appi when hazardous locations are classified as Zone 0, Zone 1, or Zone 2.

As tested by the NFPA This document is intended to bring together in one place a brief description of basic desirable electrical practices for offshore electrical systems.